Sea-hunting: With the system in hand, my eyes are the ruler

Chapter 1152



Chapter 1152

"Jiang Han, everything else is fine. The most important thing now is fresh water resources."

Jiang Han also knew that this was a very serious problem.

He had the island's freshwater lake tested and found no problems with the water quality. However, the lake here couldn't support the consumption of too many people.

After all, people who come here use a lot of water for daily use in addition to drinking water.

Bathing and washing clothes require water.

If no one else uses it, this freshwater lake with blue water can rely on its own regulation ability to survive the dry season well.

But if people continue to use water on the island, the lake will dry up during the dry season.

"Let's not talk about what happens next. The construction site also needs water to start work. Our drinking water can rely on the large barrels of mineral water transported by the ship. But industrial water can't always use mineral water, and the water consumption on the construction site is very large." Guan San reminded Jiang Han.

"Initially, industrial water will be used from freshwater lakes. Also, how long will it take to build a reservoir according to my requirements?"

"Your reservoir isn't big, and unlike other places, it doesn't involve land acquisition. If you build it directly, it'll take about half a year."

"Half a year is fine. This island has plenty of rain. As long as I build a reservoir, I can collect the rainwater. When the time comes, the water from the reservoir will be the main source. When the water in the reservoir is insufficient, the water from the freshwater lake will be used. As for the water in the infinity pool—"

Guan San remembered that Jiang Han also wanted to build a large infinity swimming pool.

"I've discussed the water use issue for the infinity pool with Mr. Sun. Infinity pools require a lot of water, and we both agreed to use seawater instead of fresh water. As long as the seawater is properly disinfected and the water is changed frequently, there won't be any problems."

Jiang Han nodded, "Of course it would be best if we could use seawater."

They usually swim in the sea and bring the sea water into the swimming pool. Theoretically there is no problem.

"The water from the freshwater lake will have to be filtered sooner or later. Before the New Year, let's get the water from the freshwater lake through the filtration equipment and bring it to the construction site."

The filtered water can be consumed and used.

Since this is preparatory work, Jiang Han hopes to solve the water and electricity problems at the construction site before the New Year.

Once the water problem is solved, the electricity problem becomes much easier. On a deserted island like this, both solar and wind energy can be used.

"No problem. What about the tavern on the sea? When do you plan to build it?"

"Can we build it together?" As the boss, Jiang Han definitely hopes that the sea bar will be launched as soon as possible.

"Of course, we can, but with so many projects running simultaneously, we'll need a lot of staff." Guan San had already arranged the staff, but judging by the current workload, the staff he had arranged probably wouldn't be enough. "We might even need to add a few more dormitories."

"If there's a need for dormitories, we'll add more. We'll try to find local staff, and if we can't find any, we'll look outside. The job market isn't optimistic right now, especially in the construction industry, where many workers are out of work. It's probably going to be easier to recruit people now."

Guan San nodded. "That's true. I know other construction workers, and they used to have so many projects that they couldn't handle them all. Now, several of them have been staying home for half a year. If even the construction workers are like this, there are even more construction workers without jobs."

"Then I'll leave this to you. The New Year is coming soon, and there's a lot of staff turnover during this period. It's best to confirm all the staff before the New Year. Then you can start work after the New Year."

"Okay, I'll make arrangements."

Guan San had worked on many projects and naturally knew many workers. If someone was currently unemployed, he could call them over. This group of people were mainly skilled technicians.

As for odd jobs like moving things around, they can still be found on the island.

Jiang Han thought of something. "The Sea Tavern also needs water. Have you and Teacher Sun decided on a solution?"


Tip: You can use left, right, A and D keyboard keys to browse between chapters.